First beers out of the door!

We brewed our Blonde and IPA last week, and a little something else that we are going to keep mostly in-house for when our Brewery Bar events start. The Blonde is 3.6% with a mix of Polish & German hops and Divination IPA is rammed full of American hops… and dry hopped too, its 5.6%.

Yesterday we brewed an all British-hopped Bitter ‘Gumption’, something English, something solid, weighing in at 4.5%, well now the weather is drawing in… ‘they are taking the roads in’ too so you’d best grab a pint and settle in.

Tomorrow we brew Bandit, Bandit is a 3.8% American Style Pale Ale, easy drinking but with plenty of hops complimented with Munich, Wheat & CaraGold malts.

We are going to need more of our Blonde to, it tasted mighty fine while filling casks on Monday.

Cheers

Coolant system fault finding

We were meant to be brewing yesterday and today though sadly we weren’t quite ready, we were very close, there were leaks around the chiller system connections that were proving rather bothersome and we discovered we had some particulate matter in our Yorkshire Water supply.
As of yesterday I think we have the leaks addressed and today we are fitting an inline filter to keep the bits out of our water while Yorkshire Water hopefully address the issue, in any case we should be good to brew next weekend.
Next jobs are to get the Cask Washer plumbed in and hand the cold store fan unit…

More fun stuff was the print proofs for our plumpclips arrived from Colourscan 🙂

Pump clip proofs

So close to first Brewday

Its been a bit hectic and I’ve not had time to think about updating the website with all efforts going into getting to the point where we can brew!
Wishbone is so close to being ready!!!! Eek!
Wishbone is so close to being ready!!!! Eek!
All our brewkit and fermenting vessels have been through passivation cleaning a thorough Hot Caustic CIP (Clean In Place) so they are ready to be used, the temperature controllers are working on the fermenters too and its just the final small pieces of chiller system plumbing to complete and hopefully we can commission the chiller system this coming week and get brewing next weekend 🙂

If all goes to plan it will go like this:
Brew 1 – Saturday 22nd Brew 2 – Sunday 23rd
Beers ferment for approximately a week
Beers racked into casks 29th & 30th (Also brew 3 & 4)
Casked beer left to cold condition in our cold store for 1 week
Deliveries of Keighley’s newest beer to local pubs Drink! (Responsibly of course)
Our first two beers will go equally well with a good Curry or a delicate fish dish
YAY!!!

We have our Premises Licence

Well thats that sorted and a step closer, our fermenting vessels should dock in Liverpool 3rd July so fingers crossed in Keighley about a week later. Installation should all be complete within a day, plumbing up, commissioning, cleaning, calibration… then hopefully brewing for August!

Now able to sell beer and perform music...

We can now sell on and off sales along with playing live and recorded music 🙂

Sloping Floors & Corrugated Steel

Our builders have been on site for a couple of days and have one day remaining to complete the sloping floors.
Progress at Wishbone today...
And we have covered the damp, hard to paint, wall which will be the Brewery Bar area with funky industrial looking corrugated steel.
The back wall of the brewery bar area, it was a damp wall that paint didn't want to stick to but now it's funky galvanised steel :-)
Our delivery from China is making its way towards Suez and it’s shipping canal leading to the Mediterranean.

Zhongde to ship Fermenters on the 19th!

The Chinese fabricator ‘Zhongde’ where we are getting our fermenting vessels built are finally ready to ship, so all being well the final payment will clear in the next day or two and they will ship on the 19th May…
Plenty of work still to do, though this week its trapped nerve stops play hopefully I’ll get back to fitness soon, I’ll have to plan how I’m going to get the fermenting vessels out of the shipping container when it arrives…

Container

Basically I have two options, borrow the neighbour’s forklift and hire some fork extensions and hope the truck has the capacity to lift, or hire a big-ass forklift with fork extensions that will be more than capable… I’m thinking the latter, though a bit more expensive is the sensible choice.

 

The Drains are in!

Builder on site! The drains went in the other week and this coming week the concrete screed falls (sloping floor) will be created, then when the concrete has cured and dried the Ultrasyntec floor guys can come and lay the polyurethane screed and make us look all posh 🙂

Thursday drainage progress

We are still decorating walls and ceilings, still building block-work cold store walls and have a number of holes to patch up around the building along with completing the concrete plinth.

Soon we can start work on the chiller system once we get the chiller unit into its permanent location. The malt loft needs some TLC, the aforementioned holes to patch up in walls, cleaning, cladding, painting to do.

The Chinese still haven’t shipped, really need them to get a move on as once the posh floor goes down we need to get brewing asap!